HP General IO Connectivity Manual de instalación Pagina 11

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 14
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 10
Installation Overview & Planning
Installing HP Fabric Clustering System
Chapter 1
11
Step 5. Fit the sliding rails over the fixed rails with the flanges facing outward until the flanges meet the
rack.
Figure 1-10 Fit Sliding Rail over Fixed Rail
Figure 1-11 Fit Sliding Rail to Rack
Step 6. Attach the rails to the rack, both sides as shown in Figure 1-12.
CAUTION Keep switch supported until rail is attached to the rack.
Figure 1-12 Attach Sliding Rail to Rack
Step 7. Securely attach all rails to the rack.
Vista de pagina 10
1 2 ... 6 7 8 9 10 11 12 13 14

Comentarios a estos manuales

Sin comentarios