
User Guide 45
10 Operational Details
This chapter describes the following:
• Operational Information, page 45
• Location of Important Log Files, page 49
• Common Issues, page 49
Operational Information
The movement of the application is initiated and controlled from the SAP ACC interface. The
administrator has a choice of five operations: prepare, start, unprepare, stop, or relocate a
resource, where relocate is a combination of the other four operations on one Managed Node. The
prepare and unprepare operations are also referred to as attach and detach.
The following diagram provides the general flow of the stop and unprepare (detach) operation. The
diagram indicates the different steps involved in the operation and which application is responsible
for managing the specific step. The process is initiated by the SAP ACC Server, the control is passed
on to the Application Integration Software, which in turn interacts with HP SIM or HP Storage
Essentials SRM to perform the necessary operations.
Comentarios a estos manuales