Hp ProLiant SL390s G7 Server Manual de usuario Pagina 28

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 85
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 27
Hardware options installation 28
4.
Open the processor locking lever and the processor socket retaining bracket. Do not remove the
processor socket cover.
IMPORTANT: Be sure the processor remains inside the processor installation tool.
5. If the processor has separated from the installation tool, carefully re-insert the processor in the tool.
Handle the processor by the edges only, and do not touch the bottom of the processor, especially the
contact area.
Vista de pagina 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 84 85

Comentarios a estos manuales

Sin comentarios