Hp ProLiant WS460c Gen8 Graphics Server Blade Manual de usuario Pagina 31

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 98
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 30
Operations 31
7.
Torque both front plate screws to 3.0~3.5 in-lbf.
IMPORTANT: Ensure that air flow impedance control labels cover the three openings on each
end of the I/O plate. These labels control the air flow into the GRID card and balance the air flow
to adjacent blades. Using the card in the expansion blade without implementing this measure
might potentially result in unexpected host shutdown of the host blade and/or nearby blades in
the same enclosure. These labels are replaceable with any commonly available tape or label, as
long as the tape or label covers the hole as shown and has construction to withstand the air flow
without deforming or falling off when powered off. After installation, always ensure that the labels
are not removed or detached.
8. Install the workstation blade into the enclosure.
9. Power up the workstation blade.
10. Download and install the latest drivers from the HP website (http://www.hp.com) or NVIDIA website
(http://www.nvidia.com/content/drivers/drivers.asp).
Vista de pagina 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 97 98

Comentarios a estos manuales

Sin comentarios