Hp Insight Management-Software Manual de usuario Pagina 118

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 129
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 117
3. In the Virtual Connect Manager user interface, delete the Ethernet networks (VLANs tagged)
that were moved from the deleted shared uplink set to another shared uplink set.
4. Go back to VCEM, and complete VC Domain Maintenance by clicking Complete VC Domain
Maintenance.
5. Click the VC Domains tab, for each VC Domain with "Configuration Mismatch" status, click
VC Domain Maintenance. To confirm the resynchronization of the selected VC Domain with
the VC Domain Group configuration, click OK.
6. Repeat steps 1 and 2 for the VC Domain where the changes were made.
7. In the Virtual Connect Manager user interface, create the Ethernet networks (VLANs tagged)
in the desired shared uplink set.
8. Go back to VCEM and complete VC Domain Maintenance by clicking Complete VC Domain
Maintenance.
118 Troubleshooting VCEM
Vista de pagina 117
1 2 ... 113 114 115 116 117 118 119 120 121 122 123 ... 128 129

Comentarios a estos manuales

Sin comentarios