HP X9300 Guía de instalación Pagina 61

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 151
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 60
NOTE: Ensure that the Management IP is on the same subnet as the cluster network
(bond0 for the unified network layout; bond1 for all other layouts).
3. The wizard now configures the active management console (Fusion Manager) on this blade.
4. Optionally, create a template to configure the remaining nodes. The template is useful only if
all of the blades have identical network configurations, such as in the unified network.
Creating the cluster on blade 1 61
Vista de pagina 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 ... 150 151

Comentarios a estos manuales

Sin comentarios