Hp SAN Virtualization Services Platform Manual de usuario Pagina 294

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 324
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 293
Methods
RequestStateChange
Method overview
This method is used to control all the tasks associated to the task group.
This method shall return:
0 "Completed with No Error" when the transition can be accomplished within the internal timeout
period
2 "Unknown/UnSpecified Error"
3 "Can not complete within Time-out Period"
5 "Invalid Parameters" when RequestedState is not 2 "Start", 3 "Suspend", nor 4 "Terminate"
4096 "Method Parameters Checked - Transition Started"
4097 "Invalid State Transition" when the requested to state is invalid.
4099 "Busy" when the a previously requested transition is underway.
A standard error message containing the meaning of the ErrorInfo returned from the method if an
error is returned.
Method parameters
IN/OUTCommentsTypeParameter Name
INThe state to which the group is to move.uint16RequestedState
IN
A datetime interval value that indicates
how long to wait until giving up.
datetimeTimeoutPeriod
HPSVSP_SyncMirrorConcreteJob : CIM_ConcreteJob
Class introduction
This class represents a sync mirror task created as a result of:
A client invoking a method on this server/agent
The server/agent invoking a method on itself
This class represents the sync mirror task. The affected task elements are elements on which the task
is acting.
EnumerateInstances:
Produce the list of sync mirror jobs.
GetInstance:
Fetch the task.
DeleteInstance:
Delete the instance.
Job Control Profile294
Vista de pagina 293
1 2 ... 289 290 291 292 293 294 295 296 297 298 299 ... 323 324

Comentarios a estos manuales

Sin comentarios