Hp Storage Mirroring Software Manual de usuario Pagina 90

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 120
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 89
88 of 118
Running reports
After adding a node to be monitored, you can try running a report against the node you
have added using the following steps.
1. In the navigation tree, select the node that you want to run a report against.
2. Select the time period that you want to run a report against from the Window drop-
down box on the main tool bar. For more information, see Selecting a reporting
time period.
3. Right-click the node and select a report from the list of reports available on the pop-
up menu. For more information about available reports, see Types of reports.
4. The report will be run and the results displayed in the right-hand side of the user
interface.
Note:
After you change the timeframe, either click the Refresh icon or press Ctrl+R to
update the data.
Vista de pagina 89
1 2 ... 85 86 87 88 89 90 91 92 93 94 95 ... 119 120

Comentarios a estos manuales

Sin comentarios