Hp StorageWorks 3000 RAID Array Manual de usuario Pagina 81

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 112
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 80
Installation and Maintenance 3-19
Compaq Confidential Need to Know Required
Writer: Bob Young Project: RAID Array 3000 Controller Shelf Hardware Users Guide Comments:
Part Number: EK-SMCPQ-UG. D01 File Name: d-ch3 Installation and Maintenance.doc Last Saved On: 12/4/00 1:08 PM
12. Install jumper connector 12-49700-01 to the controller shelf UPS
connector on the host 1 I/O module.
S
HR-111
8
DEVICE EXPANSION SHELF # 1
DEVICE EXPANSION SHELF # 2
CONTROLLER SHELF
P/S
A
P/S
A
P/S
B
P/S
B
P/S
B
P/S
A
CTR 0
Host 0 I/O
Module
Device
I/O Module
Personality I/O
Module
Personality I/O
Module
SCSI Cable
BN37A-0E
To
Maintenance
PC
To Host System
SCSI Cable
BN37A-05
Serial Control
Cable
(17-04730-01)
OFF ON
ON
OFF
1234567
SCSI Bus Address
Switch (S3)
1
2
3
4
SCSI Bus
Termination
Switch (S4)
Figure 3-11. Controller/ two device expansion shelf cabling diagram
CAUTION: To prevent possible damage to the equipment, the input voltage level
of the UPS must be set to your specific line voltage before proceeding. Refer to
the UPS manual and set the input level to your AC power sources.
13. After the UPS has been set to the correct voltage level, set the UPS low-
battery warning option to five minutes (refer to UPS manual for
instructions).
14. This completes the controller and device expansion shelf cabling
procedure. Dress and tie-wrap related cable groups, and then refer to the
Getting Started RAID Array 3000 Installation Guide and Command
Console V2.2 for the RAID Array 3000 (Pedestal and Rack Mount
Models) Users Guide for information describing how to setup and
configure your subsystem.
Vista de pagina 80
1 2 ... 76 77 78 79 80 81 82 83 84 85 86 ... 111 112

Comentarios a estos manuales

Sin comentarios