Insight Control does not detect virtual machines on mapped
network drives, 53
Insight Control server migration service
unable to communicate , 46
installation
troubleshooting, 46
Integrated Components
do not install on destination virtual machine after
migration, 63
IP address cannot be assigned on destination server, 52
K
kernel panic when booting to the Insight Control CD ISO,
50
keyboard
does not work when booting to the Insight Control CD
ISO, 51
troubleshooting, 61, 63
L
launching
migration wizard, 36
migrations through Quick Launch, 38
migrations through Systems Insight Manager, 36
licenses
overview, 10, 13
standalone documentation, 69
verifying, 19
Linux
data copy error, 58
deploying Source Agent, 26
destination physical server prerequisites, 35
destination size requirement, 28
destination virtual machine prerequisites, 35
mouse does not work, 62
P2V post-migration tasks, 43
preparing for a server migration, 34
resizing file systems, 18
Source Agent using non-root credentials fails, 49
source physical server prerequisites, 34
source server requirements, 22
source virtual machine prerequisites, 34
X2P post-migration tasks, 42
M
manually creating a virtual destination server
virtual machine, 30
menus missing, 46
Microsoft Cluster
migration overview, 70
post-migration, 71
preforming the migration, 71
premigration, 70
migration
different drive letters after migration, 62
fails with the Microsoft Hyper-V role enabled, 49
hangs if source server is shut down, 56
Microsoft Cluster server environment, 70
starting a new one after current one is stopped, 57
stops responding during auto-booting of Microsoft
Hyper-V, 53
troubleshooting, 54
migration agent
deployment fails, 48
migration checklist, 12
migration does not start after confirmation, 60
migration wizard, 13
hangs, 46
launching, 36
using to boot a virtual destination server, 31
mouse
does not work, 62
does not work when booting to the Insight Control CD
ISO, 51
troubleshooting, 61, 62, 63
N
Nagios
documentation, 67
network adapter
in destination ESX virtual machine is not initialized, 64
NTFS partitions
error message, 56
resizing, 17
O
out of memory error, 59
overview
Deploy Agent, 13
license, 13
migration wizard, 13
server migration, 12
status / logs, 13
types of migration, 10
upload drivers, 13
P
P2P, 10
post-migration tasks, 41
source server prerequisites, 32
P2V, 10
booting a virtual destination server, 31
post-migration tasks, 41
source server prerequisites, 32
using the migration wizard, 31
physical destination servers prerequisites, 28
Physical-to-ProLiant migration see P2P
Physical-to-virtual migration see P2V
planning
migration strategy, 17
preparing a schedule, 17
ports
used, 19
post-migration
troubleshooting, 60
post-migration tasks
editing the Windows Boot.ini file, 42
installing ProLiant Support Packs for Windows, 41
75
Comentarios a estos manuales