Hp Insight Control Manual de usuario Pagina 128

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 173
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 127
7. Test the network connections and latency between the source-to-destination server and the
application-station-to-destination server. The results of a 2-second test initially appear.
8. To perform additional tests, select a test time in the Test network connections section, and then click
Test. The following test times are available:
2 seconds
5 seconds
10 seconds
30 seconds
60 seconds
If you cannot establish the source-to-destination or application-station-to-destination connection, the Next
button is disabled. Ensure that ports 51125 and 51126 are open between source and destination
servers.
If you establish the source-to-destination or application-station-to-destination connection but the network
test reports a transfer speed below 250 kb/s, the Next button is disabled.
If you establish the source-to-destination or application-station-to-destination connection and the network
test reports a transfer speed of at least 250 kb/s, the Next button is enabled.
CAUTION: If the application-station-to-destination latency is less than 125 milliseconds, continue with
the migration. Latency greater than 125 milliseconds might cause driver injection issues.
9. Click Next.
128 Using Insight Control server migration to migrate servers
Vista de pagina 127
1 2 ... 123 124 125 126 127 128 129 130 131 132 133 ... 172 173

Comentarios a estos manuales

Sin comentarios