Hp Parallel Uninterruptible Power System Manual de usuario Pagina 29

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 115
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 28
UPS installation 29
Power Bus Bar
terminal block
Terminal
position
Power Bus Bar wire
function
Terminal wire size
rating*
Tightening torque
Output
1 Phase 1 out 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
2 Phase 2 out 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
3 Phase 3 out 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
Input
4 Phase 1 in 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
5 Phase 2 in 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
6 Phase 3 in 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
Neutral
7 Neutral 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
8 Neutral 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
9 Neutral 13.3 mm
2
(6 AWG)
to 177 mm
2
(350
kcmil)
31.1 Nm (275 lb in)
Safety ground
10 Ground 18 mm
2
(4 AWG) to
215mm
2
(400 kcmil)
1.8 (16 lb in)
*Use 13.3 mm
2
(6 AWG) 90º C copper wire minimum.
Connecting the ground bonding cable
The ground bonding screw is provided as an attachment point for conductors. Use a ground bonding cable
if the rack contains any conductors for the purpose of functional grounding or bonding of ungrounded metal
parts.
Vista de pagina 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 114 115

Comentarios a estos manuales

Sin comentarios