Hp ProLiant DL320 G5p Server Manual de usuario Pagina 47

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 106
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 46
Hardware options installation 47
5.
Install the battery.
6. Route the cable ("Battery cabling for BBWC" on page 54).
7. Connect the cable to the controller.
For clarity, the server is not shown in this illustration.
Dedicated iLO2 optional module connector
To install the component:
1. Power down the server (on page 20).
2. Remove the server from the rack (on page 20).
3. Remove the primary access panel (on page 21).
Vista de pagina 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 105 106

Comentarios a estos manuales

Sin comentarios