Hp ProLiant DL320e Gen8 v2-Server Manual de usuario Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 100
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
Setup 33
o
Link/Act LED on the switch network port that is being usedInitially, solid green to indicate
successful connection, and then flashing green to indicate active communication with the network.
o Fault LEDRemains off to indicate successful Self-Test completion.
For more information on the location of the switch LEDs and their behavior during the Self-Test process,
see the switch documentation.
Completing the switch setup
After the Ethernet cable connection is made, check the network LED status on both the server and the switch
to confirm successful connection:
In the server front panel, the NIC status LED Solid green
In the switch, the Link/Act LED on the network connector usedInitially, solid green to indicate
successful connection, and then flashing green to indicate active communication with the network.
Vista de pagina 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 99 100

Comentarios a estos manuales

Sin comentarios