Hp ProLiant ML10 Server Manual de usuario Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 76
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
Hardware options installation 23
11.
Connect the other end of the SATA cable to the system board.
12. Fully insert the drive carrier into the media bay until the screw holes line up with the holes in the chassis,
and then secure the drive cage, using the two M3 screws from the option kit.
13. Install the front bezel (on page 14).
14. Install the access panel (on page 14).
15. Return the server to an upright position.
16. Connect the power cord to the server.
17. Connect the power cord to the power source.
18. Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 75 76

Comentarios a estos manuales

Sin comentarios