Hp ProLiant ML350e Gen8 v2-Server Manual de usuario Pagina 78

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 129
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 77
Hardware options installation 78
o
Eight-bay SFF cable routing to box 1
o Eight-bay + eight-bay SFF cable routing to boxes 1 and 2
13. Install the fan modules and the fan blank (on page 31).
14. Install any full-length PCI expansion cards that were removed ("Installing an expansion board" on page
63).
15. Install the system air baffle (on page 28).
16. If removed, install the PCI air baffle ("PCI air baffle option" on page 38).
17. Install the access panel (on page 26).
18. Return the server to an upright position.
19. Lock the front bezel (on page 24).
20. Connect each power cord to the server.
21. Connect each power cord to the power source.
22. Power up the server (on page 23).
Vista de pagina 77
1 2 ... 73 74 75 76 77 78 79 80 81 82 83 ... 128 129

Comentarios a estos manuales

Sin comentarios