Hp Insight Management-Software Manual de usuario Pagina 21

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 150
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 20
In the event of an unplanned failover, it is possible that manual intervention may be required to
restore full operations. If a Virtual Connect Domain reports configuration mismatch or an out-of-sync
occurrence after recovering from an unplanned failover, the following actions are recommended.
Execute Mxsync in analysis mode (mysync) to determine the nature of the failure on the VC
Domain during the CMS recovery phase.
Execute Mxsync in execute mode (mxsync-e) during the CMS recovery phase, and follow
the Mxsync instructions until the VC Domains are synchronized.
If Mxsync detects and reports out-of-sync scenarios in additional subsystems, resolve them
according to instructions displayed, otherwise exit Mxsync.
NOTE: Executing mxsync e will help resolve VC Domain synchronization issues across multiple
VC domains.
Installing VCEM in an HA clustered CMS configuration in an Microsoft Cluster Server cluster 21
Vista de pagina 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 149 150

Comentarios a estos manuales

Sin comentarios