Hp 60-Modular-Smart-Array Manual de usuario Pagina 17

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 52
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 16
Setup 17
3.
Use a No. 2 Phillips screwdriver to remove the standard pins from the front and back ends of the
rail.
4. Install four round-hole pins into the rail.
5. Repeat steps 3 and 4 for the second rail.
Installing a storage enclosure into the rack
To install the storage enclosure into the rack:
1. Secure the front end of the rails to the rack.
IMPORTANT: Do not remove the pins from the ends of the rack rails unless you are converting the rails for
use in round-hole racks. These load-bearing pins are designed to fit through the holes without being
removed.
IMPORTANT: Be sure that the scissor-type locking latches engage the rack fully when the pins extend
through the holes marked with the template.
Vista de pagina 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 51 52

Comentarios a estos manuales

Sin comentarios