Hp StorageWorks 2.32 Edge Switch Manual de usuario Pagina 169

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 228
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 168
Edge Switch Element Manager user guide 169
FICON Management Server
NOTE: The FICON Management Server feature is available only for the Edge Switch 2/32. This
feature is not available on the Edge Switch 2/24.
The FICON Management Server is a keyed feature that allows host control and in-band
management of the switch through an IBM System/390
or zSeries 900 Parallel Enterprise Server
attached to a switch port. The server communicates with the switch through a FICON channel.
Control of connectivity and statistical product monitoring are provided through a console attached
to the host.
This section provides the following information:
Installing the FICON Management Server, page 169
Configuring the FICON Management Server, page 169
FICON Management Server parameters, page 170
Installing the FICON Management Server
To install and enable the FICON Management Server, select Configure > Configure Feature
Key. For more information, see ”Configuring the feature key” on page 122.
Configuring the FICON Management Server
To configure the FICON Management Server:
1. Select Configure > FICON Management Server.
2. Select the Enable FICON check box to enable the Management Server.
NOTE: To disable the Management Server, click the check box again to remove the check
mark.
3. Click Parameters to open the Configure FICON Management Server Parameters dialog box.
(See ”Open Systems Management Server” on page 171 for details about the parameters you
can set.)
4. Click Switch Clock Alert Mode to enable or disable switch clock alert mode.
When a check mark is displayed, the alert mode is enabled.
5. Click Host Control Prohibited to allow or prohibit host control.
When a check mark is displayed, host control is prohibited.
6. Click Programmed offline state control to allow or prohibit off line state control.
When a check mark is displayed, programmed control of the off line state is allowed.
7. If necessary, click a code page from the Code Page list.
8. Click Activate.
9. If you have finished configuring the switch, back up the configuration data.
For more information, seeBacking up and restoring configuration data” on page 134.
Vista de pagina 168
1 2 ... 164 165 166 167 168 169 170 171 172 173 174 ... 227 228

Comentarios a estos manuales

Sin comentarios