Hp ProLiant DL120 G6 Server Manual de usuario Pagina 37

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 113
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 36
Hardware options installation 37
11.
Connect all internal cables for expansion boards.
12. Install the access panel.
13. Install the server into the rack.
Storage controller option
IMPORTANT: For additional installation and configuration information, refer to the
documentation that ships with the option.
To install the component:
1. Power down the server (on page 15).
2. Remove the server from the rack (on page 15).
3. Remove the access panel (on page 16).
4. Remove the PCI riser board assembly (on page 16).
5. Remove the hard drive cables.
6. Install the storage controller ("Expansion board option" on page 34).
7. Connect the storage controller cable to the controller and to the hard drive.
See the server installation sheet and the documentation that ships with the storage controller.
IMPORTANT: The server does not power up if the PCI riser board assembly is not seated
properly.
8. Install the PCI riser board assembly (on page 17).
9. Install the access panel.
10. Install the server into the rack.
SAS hard drive LED cable option
The SAS hard drive LED cable provides LED functionality for SAS hard drives when an optional SAS controller
and an optional SAS controller cable are installed.
To install the component:
1. Power down the server (on page 15).
2. Remove the server from the rack (on page 15).
3. Remove the access panel (on page 16).
4. Install the optional SAS controller ("Expansion board option" on page 34).
Vista de pagina 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 112 113

Comentarios a estos manuales

Sin comentarios