Hp ProLiant DL385 G2 Server Manual de usuario Pagina 47

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 115
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 46
Hardware options installation 47
DIMM population order
Configuration Bank A
1A and 2A
Bank B
3B and 4B
Bank C
5C and 6C
Bank D
7D and 8D
Single processor 1st 2nd
Dual processor 1st 3rd 2nd 4th
Installing DIMMs
1. Power down the server (on page 23).
2. Extend the server from the rack (on page 23).
3. Remove the access panel (on page 24).
4. Remove the air baffle (on page 25).
5. Open the DIMM slot latches.
IMPORTANT: Always install memory in pairs of two identical DIMMs.
6. Install the DIMM.
7. Install the air baffle (on page 26, "Remove the air baffle" on page 25).
8. Install the access panel (on page 25).
9. Install the server into the rack.
10. Power up the server (on page 23).
For more information about LEDs and troubleshooting failed DIMMs, see "Systems Insight Display LEDs
and internal health LED combinations (on page 15)."
Hot-plug SAS hard drive options
When adding hard drives to the server, observe the following general guidelines:
Vista de pagina 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 114 115

Comentarios a estos manuales

Sin comentarios