Hp ProLiant DL385p Gen8 Server Manual de usuario Pagina 29

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 135
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 28
Operations 29
5.
If a full-length expansion board is installed in slot 1, release the full-length expansion board retainer,
and then remove the primary PCIe riser cage.
6. If a full-length expansion board is installed in slot 4, release the full-length expansion board retainer,
and then remove the secondary PCIe riser cage.
7. Remove the full-length expansion board.
To install the component, reverse the removal procedure.
Remove the primary PCIe riser cage
CAUTION: To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCIe riser cage.
1. Power down the server (on page 23).
2. Remove all power:
Vista de pagina 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 134 135

Comentarios a estos manuales

Sin comentarios