Hp ProLiant DL385p Gen8 Server Manual de usuario Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 135
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
Operations 33
7.
Secure the full-length expansion board retainer.
8. Install the access panel (on page 25).
9. Install the server into the rack ("Installing the server into the rack" on page 40).
10. Connect each power cord to the server.
11. Connect each power cord to the power source.
12. Power up the server (on page 23).
Secure the secondary PCIe riser cage full-length
expansion board retainer
1. Power down the server (on page 23).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Extend the server from the rack (on page 23).
4. Remove the access panel (on page 25).
5. Install a full-length expansion board ("Installing a full-length expansion board" on page 73).
6. Install the secondary PCIe riser cage ("Secondary PCIe riser cage option" on page 74).
Vista de pagina 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 134 135

Comentarios a estos manuales

Sin comentarios