Hp ProLiant DL385p Gen8 Server Manual de usuario Pagina 34

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 135
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 33
Operations 34
7.
Secure the full-length expansion board retainer.
8. Install the access panel (on page 25).
9. Install the server into the rack ("Installing the server into the rack" on page 40).
10. Connect each power cord to the server.
11. Connect each power cord to the power source.
12. Power up the server (on page 23).
Remove the air baffle
CAUTION: For proper cooling, do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
To remove the component:
1. Power down the server (on page 23).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Extend or remove the server from the rack ("Remove the server from the rack" on page 24, "Extend the
server from the rack" on page 23).
4. Remove the access panel (on page 25).
CAUTION: Do not detach the cable that connects the battery pack to the cache module.
Detaching the cable causes any unsaved data in the cache module to be lost.
IMPORTANT: It is necessary to remove the PCIe riser cage only if there is a full-length expansion
board installed.
5. If a full-length expansion board is installed in the primary PCIe riser cage, release the expansion board
retainer and remove the primary PCIe riser cage (on page 29).
Vista de pagina 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 134 135

Comentarios a estos manuales

Sin comentarios