Hp XP Continuous Access Software Manual de usuario Pagina 81

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 215
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 80
5. When you perform delta resync operation on the volume in XP Continuous Access Synchronous
primary site, the status of the XP Continuous Access Journal pair's data volumes changes as
explained in Table 21 (page 81).
Table 21 Changes to XP Continuous Access Journal pair status by delta resync ops. (transferring
tasks between XP Continuous Access Journal secondary to primary sites)
Pair status after delta resync operationPair status before delta resync operationXP Continuous Access
Journal pair
Secondary data
volume
Primary data volumeSecondary data
volume
Primary data volume
PAIR or COPYPAIR or COPYHOLDHOLDXP Continuous Access
Journal pair between
XP Continuous Access
Synchronous primary
site and XP
Continuous Access
Journal secondary site
HOLDHOLDPAIR, PSUS, or PSUEPAIR, PSUS, or PSUEXP Continuous Access
Journal pair between
XP Continuous Access
Synchronous
secondary site and XP
Continuous Access
Journal secondary site
CAUTION: After you remove failures from the primary site and other locations and then the system
is changed to 3DC multi-target configuration (see Requirements for creating XP Continuous Access
Journal pairs for delta resync operations), the status of a pair between the primary site and the XP
Continuous Access Journal secondary site may be abnormal. If the status of the pair remains
abnormal, you will be unable to transfer your business tasks back to the primary site. To solve this
problem, check the pair status and then perform a problem-solving operation before transferring
business tasks back to the primary site.
Table 22 Pair Status and Operation after Recovery of the Primary Site
Perform the Following Operation before Transferring Business
Tasks Back to the Primary Site
If the Status of the Pair
in the UR Secondary
Site is
If the Status of the
Pair in the Primary
Site is
No
Make sure that the status of the pair in the primary site is PSUE
or PSUS, and then perform the operation explained in row No.
3 of this table.
HOLDCOPY1
Perform the operation explained in row No. 1 of this table.HOLDPAIR2
1. Remove the XP Continuous Access Journal pair from the
primary site.
2. Make sure that all the pairs belonging to the journal group
in the primary site are removed.
3. Create an XP Continuous Access Journal delta resync pair
that extends from the primary site to the XP Continuous Access
Journal secondary site. For information about requirements
for creating the pair, see Requirements for creating XP
Continuous Access Journal pairs for delta resync operations.
HOLDPSUE or PSUS3
The pair is in normal condition. You can transfer business tasks
as described earlier in this section.
HOLDHOLD4
Combining XP Continuous Access Journal with other data management functions 81
Vista de pagina 80
1 2 ... 76 77 78 79 80 81 82 83 84 85 86 ... 214 215

Comentarios a estos manuales

Sin comentarios