
Operations 22
2.
Tighten the PCI riser cage thumbscrews.
3. Install the access panel (on page 19).
4. Do one of the following:
o Slide the server into the rack.
o Install the server into the rack ("Installing the server into the rack" on page 27).
5. Power up the server (on page 16).
Comentarios a estos manuales