
Hardware options installation 38
2.
Prepare the drive.
3. Install the drive.
4. Determine the status of the drive from the drive LED definitions (on page 16).
To configure arrays, see the HP Smart Storage Administrator User Guide on the HP website
(http://www.hp.com/go/smartstorage/docs).
Rear drive cage options
The server supports a two-bay LFF or SFF rear drive cage option. When a rear drive cage option is installed,
the optical drive is disabled.
Installing a 2 LFF rear drive cage option
1. Power down the server (on page 20).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
o Extend the server from the rack (on page 20).
o Remove the server from the rack (on page 22).
4. Remove the access panel (on page 23).
Comentarios a estos manuales