
Hardware options installation 32
4.
Prepare the drive.
5. Install the drive.
6. Install the tower bezel (on page 20).
7. Power up the server (on page 19).
Drive cage options
Four-bay LFF hot-plug drive cage option
To install the component:
1. Power down the server (on page 19).
2. Remove all power:
a. Disconnect each power cord from the power source.
Comentarios a estos manuales