Hp ProLiant ML110 G7 Server Manual de usuario Pagina 50

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 113
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 49
Hardware options installation 50
9.
Install the expansion board.
10. Connect any required internal or external cables to the expansion board. See the documentation that
ships with the expansion board.
11. If installing a full-length expansion board, install back the board retainer.
12. Install the air baffle (on page 22).
13. Install the access panel (on page 21).
14. Lock the tower bezel.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17. Power up the server (on page 19).
Dedicated iLO management port option
NOTE: Depending on model purchased, the server may look slightly different than shown.
To install the component:
1. Power down the server (on page 19).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Unlock the tower bezel ("Unlock and open the tower bezel" on page 20).
4. Remove the access panel (on page 21).
Vista de pagina 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 112 113

Comentarios a estos manuales

Sin comentarios