Hp ProLiant ML350 G5 Server Manual de usuario Pagina 25

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 118
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 24
Setup 25
UPS
Contents of the rack server shipping carton
Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the
rack or the server.
The contents of the server shipping carton include:
Server
Power cord
Hardware documentation, Documentation CD, and software products
Rack-mounting hardware
In addition to the supplied items, you may need:
T-15 Torx screwdriver
Hardware options
Operating system or application software
PDU
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
29)."
Setting up a tower server
Follow the steps in this section to set up a tower model server. If you are going to install the server into a
rack, refer to the rack installation ("Installing the server into the rack" on page 26) section.
Vista de pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 117 118

Comentarios a estos manuales

Sin comentarios