Hp ProLiant ML350 G5 Server Manual de usuario Pagina 62

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 118
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 61
Hardware options installation 62
Tower-to-rack conversion option
The tower-to-rack conversion kit includes all equipment required to convert the tower model server into a
rack model server and to install the server into most square- or round-hole racks.
The tower-to-rack conversion kit includes:
Rack rails
Cable management arm
Server rails
Cage nuts
Rack bezel
Cable management arm extender bracket, included with the server
In addition to the supplied items, you may need:
T-10 Torx screwdriver
T-15 Torx screwdriver
To convert a tower server to a rack server:
1. Power down the server (on page 17).
2. Remove the tower bezel ("Open or remove the tower bezel" on page 18).
3. Remove the feet.
4. Remove both tower configuration panels.
Vista de pagina 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 117 118

Comentarios a estos manuales

Sin comentarios