Hp ProLiant ML370 G6 Server Manual de usuario Pagina 38

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 172
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 37
Setup 38
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page 41)."
Setting up a tower server
Follow the steps in this section to set up a tower model server. If you are going to install the server into a rack,
refer to the rack installation section ("Installing the server into the rack" on page 39).
1. Place the server on a flat, stable surface.
2. Install the tower feet.
3. Connect peripheral devices to the server. ("Rear panel components" on page 11)
WARNING: To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
4. Connect the power cord to the rear of the server.
5. Open the power cord retaining clip, and thread the power cord through the retaining clip.
Vista de pagina 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 171 172

Comentarios a estos manuales

Sin comentarios