
Operations 27
2.
Route the Mini-SAS cable through the air baffle cable management, and then connect it to the system
board ("Connect the Mini-SAS cable" on page 24).
3. Install the 2U adapter board bracket (on page 23).
4. Install the PCI riser cage (on page 21).
5. Install the node into the chassis ("Installing a node into the chassis" on page 30).
6. Connect all peripheral cables to the node.
7. Power up the node ("Power up the nodes" on page 17).
Remove the 1U air baffle
1. Power down the node (on page 17).
2. Disconnect all peripheral cables from the node.
3. Remove the node from the chassis (on page 17).
4. Remove the 1U cable guard (on page 18).
5. Remove the 1U air baffle.
Comentarios a estos manuales