HP 24S Guía de usuario Pagina 79

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 102
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 78
Reactivating the Primary Link
When the primary link is repaired, you can use any of the following methods to reenable
the primary port:
From the hub’s console, use the Port command, PO n ON where n is the
primary port’s ID.
Cycle power on the hub. This is useful if you do not have access to the hub’s
console interface (for example, because the hub is in a wiring closet and a console
is not connected).
From an HP network management station, reenable the port or reset the hub.
See the network management product documentation for details on how to enable
a port or reset the hub.
When the primary port is reenabled, the backup port is automatically disabled and
returned to backup mode.
Backup Links E-5
Vista de pagina 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 101 102

Comentarios a estos manuales

Sin comentarios