HP Modular Cooling System 200/100
Site Preparation Guide
Abstract
This document provides site preparation guidance for the MCS-
200/100.
Part Number: 749810-001
June 2014
Edition: 1
Vista de pagina 0
1 2 3 4 5 6 ... 92 93

Indice de contenidos

Pagina 1 - Site Preparation Guide

HP Modular Cooling System 200/100 Site Preparation Guide Abstract This document provides site preparation guidance for the MCS-200/100. Part Numb

Pagina 2

Overview 10 Air flow for MCS-100 (dual-rack configuration)

Pagina 3 - Contents

Overview 11 Air flow for MCS-200 (single-rack configuration)

Pagina 4 - Contents 4

Overview 12 Air flow for MCS-200 (dual-rack configuration) The special horizontal airflow of the MCS-200/100 fully supports the industry standard f

Pagina 5 - Overview

Overview 13 • Fan controller—Operates the fans, according to the cabinet air temperature • Air bleeder valve—Enables air to manually bleed out of

Pagina 6 - Overview 6

Overview 14 Item Description 1 Control valve 2 Flow meter 3 Humidity sensor 4 Heat exchanger unit 5 Fan units (1 fan by default, 4 fans maximum) 6

Pagina 7 - Overview 7

Overview 15 Item Reference 7 Heat exchanger unit 8 TFT touchscreen display (optional) 9 Fan units (1 fan by default, 4 fans maximum) 10 Management

Pagina 8 - Product overview

Overview 16 The following illustrations show the MCS-200 optional components. Unit side view Item Reference 1 Condensation pump 2 Condensation pu

Pagina 9 - Overview 9

Overview 17 For easier viewing, the canopies are not shown in this illustration. Item Reference 1 Water module 2 Fan module 3 Condensation pump t

Pagina 10 - Overview 10

Overview 18 Parameter Packaged system (as shipped on pallet) Unpackaged system (off pallet, unwrapped) Unpackaged CTO system Height 2159 mm (85 inc

Pagina 11 - Overview 11

Overview 19 Parameter Value Comments Power cord 230 V, 16 A 208 V, 18 A IEC 309-to-Procon 700105 NEMA L6-20-to-Procon 700105 The following table

Pagina 12 - Key components

© Copyright 2014 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties

Pagina 13 - MCS-100 components

Facility planning for implementation 20 Facility planning for implementation Facility planning overview The MCS-200/100 offers an incremental data c

Pagina 14

Facility planning for implementation 21 Delivery space requirements Be sure your facility has adequate space to receive and remove the MCS-200/100 f

Pagina 15 - MCS-200 components

Facility planning for implementation 22 CAUTION: HP recommends that a ramp angle of no greater than 5° be used to move the MCS-200/100 up or down

Pagina 16 - Unit top view

Facility planning for implementation 23 MCS-200/100 expansion rack Item Reference 1 MCS-200/100 expansion rack shock pallet 2 4-piece ramp 3 MCS-

Pagina 17 - Physical specifications

Facility planning for implementation 24 MCS-100 unit (single-rack configuration) MCS-100 unit (dual-rack configuration)

Pagina 18 - Electrical specifications

Facility planning for implementation 25 MCS-200 unit (single-rack configuration) MCS-200 unit (dual-rack configuration) System positioning The MC

Pagina 19 - Parameter Value Comments

Facility planning for implementation 26 Flush front configuration examples When arranging the MCS-100 or MCS-200/100 next to an HP Intelligent Seri

Pagina 20 - Facility planning overview

Facility planning for implementation 27 • Bottom view The following figure shows the size and position of the cable openings at the top and bottom

Pagina 21 - Delivery space requirements

Facility planning for implementation 28 • Top view • Bottom view The following figure shows the size and position of the cable openings at the t

Pagina 22

Facility planning for implementation 29 • Top view • Bottom view Cabinet leveling feet

Pagina 23

Contents 3 Contents Overview ...

Pagina 24

Facility planning for implementation 30 WARNING: Static loading limits cannot be achieved if the rack is not on its leveling feet or is rolled or

Pagina 25 - System positioning

Facility planning for implementation 31 o MCS-100 dual-rack configuration • IT rack side view

Pagina 26 - Cable openings

Facility planning for implementation 32 o MCS-100 single-rack configuration

Pagina 27 - • Top view

Facility planning for implementation 33 o MCS-100 dual-rack configuration MCS-200 cabinet leveling feet locations: • Bottom view

Pagina 28

Facility planning for implementation 34 o MCS-200 single-rack configuration

Pagina 29 - Cabinet leveling feet

Facility planning for implementation 35 o MCS-200 dual-rack configuration • IT rack side view

Pagina 30

Facility planning for implementation 36 o MCS-200 single-rack configuration

Pagina 31 - • IT rack side view

Facility planning for implementation 37 o MCS-200 dual-rack configuration The leveling feet pads help to ensure weight distribution and help transf

Pagina 32

Facility planning for implementation 38 The MCS-200/100 has not been certified for seismic environments. The following table can be used to calculat

Pagina 33

Facility planning for implementation 39 The weight distribution on the leveling feet locations in MCS-100 and MCS-200 are very similar. Item Weig

Pagina 34

Contents 4 Appendix B: Conversion factors and formulas ... 85 Conversio

Pagina 35

Facility planning for implementation 40 Item Weight A 385 kg (849 lb) B 455 kg (1003 lb) C 458 kg (1010 lb) D 385 kg (849 lb) E 375 kg (827 lb) F

Pagina 36

Facility planning for implementation 41 The MCS-200 provides two Walther Procon A5 series AC input connections and ships with one set of two power c

Pagina 37 - Floor loading considerations

Facility planning for implementation 42 MCS-200 Raised floor grounding Item Description 1 Ground wire to power panel 2 Floor panel 3 Hex bolt 4

Pagina 38

Facility planning for implementation 43 Voltage fluctuations and outages The MCS-200/100 is designed to provide immunity to power outages of less th

Pagina 39 - Item Weight

Facility planning for implementation 44 MCS-200/100 power L6-20 connector MCS-200/100 IEC 309 power connector At least one power cord must be used

Pagina 40 - Electrical considerations

Facility planning for implementation 45 When using only a single, primary source for power, the AC power cord is connected to the left-most receptac

Pagina 41 - System grounding

Facility planning for implementation 46 • The water source should be shared water or dedicated facility water loop. • Maximum and minimum temperat

Pagina 42 - Item Description

Facility planning for implementation 47 • Flow rate and pressure capacity of chilled water plant input to the design of the facility feed line and

Pagina 43

Facility planning for implementation 48 Item Description (quantity) 4 M6 screw (4) 5 5mm Hex L-key (1) 6 Warning label (2) 7 M5.5 x 10 self-tapping

Pagina 44

Facility planning for implementation 49 • Above the floor (for MCS-200 only)

Pagina 45 - Coolant source planning

Overview 5 Overview Overview The MCS-200/100 is a supplemental cooling system for data centers. It is offered in four configurations: • MCS-100 uni

Pagina 46 - Plumbing considerations

Facility planning for implementation 50 • Above the unit An HP Water Hook Up Kit must be installed prior to activating an MCS-200/100. The kit con

Pagina 47 - HP Water Hook-Up Kit

Facility planning for implementation 51 of 8 mm (0.31 inch). The preferred method of routing for all hoses is downward at an angle of at least 3º (p

Pagina 48

Facility planning for implementation 52 The following figure shows the recommended facility piping approaches to the MCS-200/100. Item Description

Pagina 49

Facility planning for implementation 53 • Bottom view • Top view MCS-200 hose openings

Pagina 50 - • Above the unit

Facility planning for implementation 54 • Bottom view • Top view

Pagina 51 - Piping approaches

Facility planning for implementation 55 • Rear view Raised floor cutouts for the MCS unit A complete MCS-200/100 installation typically requires

Pagina 52 - Hose openings

Facility planning for implementation 56 Recommended floor cutouts (single rack configuration)—Option 1 (MCS-100 cooling unit side flush to tile)

Pagina 53

Facility planning for implementation 57 Recommended floor cutouts (single rack configuration)—Option 2 (MCS-100 rack side flush to tile)

Pagina 54

Facility planning for implementation 58 Recommended floor cutouts (dual rack configuration)—Option 3 (MCS-100 cooling unit side to tile)

Pagina 55 - • Rear view

Facility planning for implementation 59 Recommended floor cutouts (dual rack configuration)—Option 4 (MCS-100 right side to tile) MCS-200 floor til

Pagina 56

Overview 6 • MCS-100 unit (dual-rack configuration)

Pagina 57

Facility planning for implementation 60 Recommended floor cutouts (single rack configuration)—Option 1 (MCS-200 cooling unit side and front flush to

Pagina 58

Facility planning for implementation 61 Recommended floor cutouts (single rack configuration)—Option 2 (MCS-200 rack side and front flush to tile)

Pagina 59 - MCS-200 floor tile cutouts

Facility planning for implementation 62 Recommended floor cutouts (single rack configuration)—Option 3 (MCS-200 cooling unit side and rear flush to

Pagina 60

Facility planning for implementation 63 Recommended floor cutouts (single rack configuration)—Option 4 (MCS-200 cooling unit side and rear flush to

Pagina 61

Facility planning for implementation 64 Recommended floor cutouts (dual rack configuration)—Option 5 (MCS-200 cooling unit side and front flush to t

Pagina 62

Facility planning for implementation 65 Recommended floor cutouts (dual rack configuration)—Option 6 (MCS-200 rack side and front flush to tile)

Pagina 63

Facility planning for implementation 66 Recommended floor cutouts (dual rack configuration)—Option 7 (MCS-200 cooling unit side and rear flush to ti

Pagina 64

Facility planning for implementation 67 Recommended floor cutouts (dual rack configuration)—Option 8 (MCS-200 cooling unit side and rear flush to ti

Pagina 65

Facility planning for implementation 68 Recommended plumbing configuration for the MCS-200/100 Typical plumbing components for an MCS-200/100 confi

Pagina 66

Facility planning for implementation 69 Item Description Specifications 6 Strainer isolation valves Valve type: 31.75-mm (1.25-inch), two-piece,

Pagina 67

Overview 7 • MCS-200 unit (single-rack configuration)

Pagina 68

Facility planning for implementation 70 Item Description Specifications 21 Test plug Type: Corrosion-resistant brass body with core inserts, gask

Pagina 69

Facility planning for implementation 71 Coolant requirements General thermal requirements The following table lists the coolant requirements that th

Pagina 70

Facility planning for implementation 72 Cooling loop sizing Sizing the cooling loops can be straight forward based on the planned cooling requiremen

Pagina 71 - Coolant requirements

Facility planning for implementation 73 Number of fans HP Modular Cooling System 200/100 HP Modular Cooling System 200/100 with Expansion Rack MCS-2

Pagina 72 - Cooling loop sizing

Facility planning for implementation 74 When the minimum heat load is not provided to the MCS-200/100, unstable control of the temperatures and flo

Pagina 73

Facility planning for implementation 75 MCS-200 coolant flow requirements with 20°C (68°F) server intake air MCS-100 coolant flow requirements with

Pagina 74

Facility planning for implementation 76 MCS-200 coolant flow requirements with 25°C (77°F) server intake air MCS-100 coolant flow requirements with

Pagina 75

Facility planning for implementation 77 Flow rate versus delta pressure (water control valve fully open)—MCS-100 Flow rate versus delta pressure (w

Pagina 76

Facility planning for implementation 78 available, the provided system pressure difference must be slightly higher than the maximum pressure loss wi

Pagina 77

Facility planning for implementation 79 • Be sure facility managers understand that additional load is being added to the facility water supply. Be

Pagina 78 - Additional water precautions

Overview 8 • MCS-200 unit (dual-rack configuration) For successful site preparation, consider the following information: • To provide dedicated c

Pagina 79 - Control system

Facility planning for implementation 80 • Be sure the chilled water source is on and flowing prior to the start-up of an MCS-200/100. • Be sure th

Pagina 80

Appendix A: Forms and checklists 81 Appendix A: Forms and checklists Delivery survey form WARNING: To prevent possible serious personal injury or

Pagina 81 - Delivery survey form

Appendix A: Forms and checklists 82 Pre-installation checklists Site preparation checklist The tables below are site preparation checklists. For eac

Pagina 82 - Pre-installation checklists

Appendix A: Forms and checklists 83 Item Area/condition Yes No Comment/date 6 Is there a dedicated branch circuit for equipment? 7 Is there

Pagina 83 - Cooling considerations

Appendix A: Forms and checklists 84

Pagina 84

Appendix B: Conversion factors and formulas 85 Appendix B: Conversion factors and formulas Conversion factors and formulas The conversion factors pr

Pagina 85 - Formulas

Regulatory information 86 Regulatory information Safety and regulatory compliance For safety, environmental, and regulatory information, see Safety

Pagina 86 - Regulatory information

Regulatory information 87 Under NRC regulations, a general licensee using tritium EXIT signs: • must NOT remove the labeling or radioactive symbol,

Pagina 87 - Regulatory information 87

Support and other resources 88 Support and other resources Before you contact HP Be sure to have the following information available before you call

Pagina 88 - Support and other resources

Acronyms and abbreviations 89 Acronyms and abbreviations BSPP british standard pipe parallel CHWR chilled water return CHWS chilled water supply

Pagina 89 - Acronyms and abbreviations

Overview 9 Air flow for MCS-100 (single-rack configuration)

Pagina 90

Acronyms and abbreviations 90 UPS uninterruptible power system WSP water steam pressure

Pagina 91 - Documentation feedback

Documentation feedback 91 Documentation feedback HP is committed to providing documentation that meets your needs. To help us improve the documentat

Pagina 92 - Index 92

Index 92 A acceptable water quality specifications 78 Appendix 81, 85 B battery replacement notice 86 before installing/running activ

Pagina 93 - Index 93

Index 93 K key components 12 kVa conversions 85 M Maneuvering space requirements 21 MCS-100 components 13 MCS-200 components