Appendix A: Forms and checklists 82
Pre-installation checklists
Site preparation checklist
The tables below are site preparation checklists. For each item, check "yes" or "no" in the appropriate
column.
If the answer is no, then include a comment or explanation and the date. An alternative solution might be
required
Facility considerations
Item Area/condition Yes No Comment/date
1
Is there adequate clearance from the loading area to the installation
site to accommodate rack dimensions, including the pallet, if
applicable?
2
Is there a completed floor plan, including a detailed location of the
HP Modular Cooling System 200/100 relative to the floor tile breaks
and supports?
3
Is there adequate space for maintenance needs? Recommended
clearances are minimum 1,219 mm (48 inches) in front, minimum
914 mm (36 inches) in the rear.
4
Is access to the site or computer room restricted?
5
Is the computer room structurally complete? What is the expected
date of completion?
6
Is a raised floor installed and in good condition?
7
Is a raised floor system, including needed cutouts, able to adequately
support the fully loaded rack and MCS-200?
8
Are there channels or cutouts for cable routing?
9
Is there a network line available?
10
Are floor tiles in good condition and properly braced?
11
Is there a leak detector for the facility water system (external to the
MCS-200)?
12
Are masonite boards available for floor protection during rack
movement over carpets and thresholds?
Power and lighting considerations
Item Area/condition Yes No Comment/date
1
Are there AC outlets available for servicing needs (for example, for
laptop)?
2
Does the input voltage correspond to MCS-100 and MCS-200/100
specifications?
3
Is dual source power used? If so, identify types and evaluate
grounding.
4
Does the input frequency correspond to equipment specifications?
5
Is power conditioning equipment installed?