HP Modular Cooling System Guía de inicio rápido Pagina 80

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 93
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 79
Facility planning for implementation 80
Be sure the chilled water source is on and flowing prior to the start-up of an MCS-200/100.
Be sure the MCS-200/100 is operational and running before turning on the servers and closing the
front and rear cabinet doors.
For more information on the installation of the HP Modular Cooling System 200/100, see the HP Modular
Cooling System 200/100 Installation Guide.
Vista de pagina 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 92 93

Comentarios a estos manuales

Sin comentarios