Hp Hitachi Dynamic Link Manager Software Manual de usuario Pagina 175

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 422
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 174
Figure 4-1 Using the command to confirm that an LU has been added on
page 4-17 shows an example of using the command to confirm that an
LU has been added. For details about the HDLM GUI, see the HDLM GUI
Help.
Figure 4-1 Using the command to confirm that an LU has been
added
5. For the new LU, write a signature, create partitions, and then format it.
Note:
The PathID is determined by the system choosing the smallest,
available number that is not already in use for another path. For
example, when a path is deleted and then a new path is added, the
PathID for the added path might not be the same number as the
deleted PathID.
When MSCS is used
1. Add an LU.
2. Stop node B.
3. On node A, perform the steps shown in When MSCS is not used.
4. Stop node A, and then start node B.
5. On node B, perform the steps shown in When MSCS is not used.
When you create a partition, assign the same drive letter as the one
assigned for node A in step 3.
6. Stop node B, and then restart node A.
7. On node A, register the new LU in MSCS, and set it up.
8. Restart node B.
HDLM Operation
4-17
Hitachi Dynamic Link Manager User Guide (for Windows(R))
Vista de pagina 174
1 2 ... 170 171 172 173 174 175 176 177 178 179 180 ... 421 422

Comentarios a estos manuales

Sin comentarios