Hp Hitachi Dynamic Link Manager Software Manual de usuario Pagina 213

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 492
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 212
4. HDLM Operation
189
Figure 4-1: Using the command to confirm that an LU has been added
5. For the new LU, write a signature, create partitions, and then format it.
Note:
The PathID is determined by the system choosing the smallest, available number
that is not already in use for another path. For example, when a path is deleted and
then a new path is added, the PathID for the added path might not be the same
number as the deleted PathID.
When MSCS is used
1. Add an LU.
2. Stop node B.
3. On node A, perform the steps shown in When MSCS is not used.
4. Stop node A, and then start node B.
5. On node B, perform the steps shown in When MSCS is not used.
When you create a partition, assign the same drive letter as the one assigned for
node A in step 3.
6. Stop node B, and then restart node A.
7. On node A, register the new LU in MSCS, and set it up.
Vista de pagina 212
1 2 ... 208 209 210 211 212 213 214 215 216 217 218 ... 491 492

Comentarios a estos manuales

Sin comentarios