Hardware options installation 40
8.
Install the battery pack.
9. Route the cable ("BBWC battery cabling" on page 50).
10. Install the PCIe riser cage (on page 19).
11. Install the access panel (on page 18).
12. Install the server into the rack ("Installing the server into the rack" on page 25).
13. Power up the server ("Powering up and configuring the server" on page 26, on page 17).
Redundant hot-plug power supply option (with cage)
To install the component:
1. Power down the server (on page 17).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Remove the server from the rack (on page 17).
4. Remove the access panel (on page 18).
5. Remove the air baffle (on page 19).
6. Remove the PCIe riser cage (on page 18).
7. Disconnect any power cables connected to the front drive cage.
8. Remove all cables connected to the system board.
9. Remove the system board.