
Operations 23
1.
Install the air baffle.
2. Install the BBWC battery pack, if removed ("Installing the BBWC battery pack" on page 57).
3. Install the access panel (on page 21).
4. Slide the server into the rack.
5. Power up the server (on page 19).
Remove the PCI riser board assembly
CAUTION: To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCI riser board assembly.
1. Power down the server (on page 19).
2. Extend the server from the rack (on page 19).
3. Remove the access panel (on page 21).
4. Remove the BBWC battery pack, if installed ("Remove the BBWC battery pack" on page 21).
5. Remove the air baffle (on page 22).
6. Remove the PCI riser board assembly:
a. Disconnect external cables connected to any existing expansion boards.
b. Loosen the four PCI riser board assembly thumbscrews.
Comentarios a estos manuales