Hp ProLiant DL360 G6 Server Manual de usuario Pagina 57

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 127
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 56
Hardware options installation 57
5.
Install the cache module in the SAS cache module connector on the system board. For connector
locations, see "System board components (on page 11)."
6. Install the PCI riser board assembly (on page 24).
7. Install the access panel (on page 21).
8. Slide the server into the rack.
9. Power up the server (on page 19).
Installing the BBWC battery pack
1. Power down the server (on page 19).
2. Extend the server from the rack (on page 19).
3. Remove the access panel (on page 21).
4. Remove the PCI riser board assembly (on page 23).
5. Install the cache module ("Installing the cache module" on page 56).
6. Install the BBWC battery pack.
Vista de pagina 56
1 2 ... 52 53 54 55 56 57 58 59 60 61 62 ... 126 127

Comentarios a estos manuales

Sin comentarios