
Operations 26
Install the PCI riser cage
1. Power down the server (on page 22).
2. Extend the server from the rack (on page 22).
3. Remove the access panel (on page 23).
4. Install the PCI riser cage.
5. Install the full-length expansion board retainer (on page 26) if any full-length expansion boards are
installed.
6. Install the access panel (on page 24).
7. Install the server into the rack ("Installing the server into the rack" on page 35).
8. Power up the server (on page 22, "Powering up and configuring the server" on page 37).
Install the full-length expansion board retainer
1. Power down the server (on page 22).
2. Extend the server from the rack (on page 22).
3. Remove the access panel (on page 23).
4. Install the PCI riser cage (on page 26).
Comentarios a estos manuales