
Operations 27
5.
Install the full-length expansion board retainer.
6. Install the access panel (on page 24).
7. Install the server into the rack ("Installing the server into the rack" on page 35).
8. Power up the server (on page 22, "Powering up and configuring the server" on page 37).
Access the product rear panel
Cable management arm with left-hand swing
To access the server rear panel:
1. Remove the cable arm retainer.
Comentarios a estos manuales