Hp ProLiant DL385 G7 Server Manual de usuario Pagina 56

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 111
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 55
Hardware options installation 56
7.
Connect any required internal or external cables to the expansion board. See the documentation that
ships with the expansion board.
8. Install the PCI riser cage (on page 26).
9. Install the full-length expansion board retainer (on page 26).
10. Install the access panel (on page 24).
PCI riser board option
CAUTION: For proper cooling do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components,
minimize the amount of time the access panel is open.
1. Power down the server (on page 22).
2. Extend the server from the rack (on page 22).
3. Remove the access panel (on page 23).
4. Remove the full-length expansion board retainer (on page 24) if any full-length expansion boards are
installed.
5. Remove the PCI riser cage (on page 25).
6. Install the optional riser board.
7. Install any expansion boards. ("Expansion board options" on page 53)
8. Install the PCI riser cage (on page 26).
9. Install the full-length expansion board retainer (on page 26) if any full-length expansion boards are
installed.
10. Install the access panel (on page 24).
11. Install the server into the rack.
12. Power up the server (on page 22, "Powering up and configuring the server" on page 37).
Vista de pagina 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 110 111

Comentarios a estos manuales

Sin comentarios