
Hardware options installation 40
c.
Connect the SATA cable to the rear drive cage, secure the cable in the cable clip, and then connect
the cable to the system board.
d. Install the primary PCI riser cage ("Install the PCI riser cages" on page 25).
10. Connect the rest of the drive cables required in this drive configuration. For more information, see
"Storage cabling (on page 81)."
11. Install the drives ("Installing a hot-plug drive" on page 36).
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless
all bays are populated with either a component or a blank.
12. Install the access panel (on page 23).
13. Install the server into the rack ("Installing the server into the rack" on page 32).
14. Power up the server (on page 19).
Installing a 2 SFF rear drive cage option
1. Power down the server (on page 19).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
o Extend the server from the rack (on page 19).
o Remove the server from the rack (on page 21).
4. Remove the access panel (on page 22).
Comentarios a estos manuales