HP Proliant ML350 Generation 3 Guía de instalación Pagina 122

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 197
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 121
Cabling Guidelines
Cabling a SmartArray or other RAID Controller
Many configurations are possible when SCSI controllers are added. This section
outlines the procedure for connecting internal hard drives to a SCSI controller option
or a SmartArray Controller and assumes that the controller option or SmartArray
Controller is already installed.
If hard drives and the SCSI or SmartArray Controller are not already installed, follow
the steps in the sections “Installing and Removing a Hot-Plug Hard Drive” and
“Installing an Expansion Board” in Chapter 3, “Hardware Options Installation.”
To cable a SmartArray or other RAID controller:
1. Locate the SCSI cable that is connected to the primary SCSI controller channel.
Figure 4-6: Locating the SCSI cable
4-8 HP ProLiant ML350 Generation 3 Server Setup and Installation Guide
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: e-ch4 Cabling Guidelines.doc
Codename: Steel Venom Part Number: 316354-001 Last Saved On: 12/9/02 8:20 AM
Vista de pagina 121
1 2 ... 117 118 119 120 121 122 123 124 125 126 127 ... 196 197

Comentarios a estos manuales

Sin comentarios