18 CHAPTER 2: INSTALLING THE SERVER LOAD BALANCER
Package Contents Your shipping container should contain the following items:
■ Server Load Balancer (3C11620)
or Server Load Balancer Plus (3C11621)
■ User Guide (this guide)
■ Power Cord
■ 2 x mounting brackets
■ 6 x screws
■ 4 x rubber feet
Choosing a Suitable
Site
The Server Load Balancer is suited for use where it can be mounted in a
standard 19-inch equipment rack, or free-standing. A rack-mounting kit,
containing two mounting brackets and six screws is supplied with the
unit.
CAUTION: Ensure that the ventilation holes are not obstructed.
When deciding where to position the Server Load Balancer, ensure that:
■ Cabling is located away from sources of electrical noise such as radios,
transmitters and broadband amplifiers.
■ Cabling is located away from power lines and fluorescent lighting
fixtures
■ The Server Load Balancer is accessible and cables can be connected
easily.
■ Water or moisture cannot enter the case of the Server Load Balancer.
■ Air-flow is not restricted around the Server Load Balancer or through
the vents in the side of the Server Load Balancer. 3Com recommends
that you provide a minimum of 25 mm (1 in.) clearance.
■ The air is as free from dust as possible.
■ No more than four Server Load Balancer units are placed on top of
one another, if the units are free-standing.
■ Temperature operating limits are not exceeded. It is recommended
that the unit is installed in a clean, air conditioned environment.
■ Ensure there is adequate clearance at the front of the unit to ensure
that the fibers are not damaged as they have a restricted bend radius.
slb_gsg.bk Page 18 Thursday, May 31, 2001 8:57 AM