Hp 3PAR Operating System Software Manual de usuario Pagina 221

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 289
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 220
2. Verify that failover tasks complete successfully (failover of individual groups can still fail).
For example, failing over to the asynchronous periodic backup system (SystemC) results in
a task list that looks like the following:
# setrcopygroup failover -f -t SystemA
failover started with tasks: 6740
~/bin# waittask -v 6740
Id Type Name Status Phase Step -------StartTime------- -FinishTime-
6740 remote_copy_failover multi.1.r96 active 1/3 0/1 2009-06-29 14:43:44 PDT -
Detailed status:
2009-06-29 14:43:44 PDT Created task.
2009-06-29 14:43:44 PDT Begin Failover operation on group multi.1.r96 started.
2009-06-29 14:43:47 PDT Pushing Pushing newer data from target SystemB to group multi.1.r96.
2009-06-29 14:43:47 PDT Waiting Waiting for synchronization of group multi.1.r96 to target
SystemB to complete.
2009-06-29 14:44:04 PDT Pushed Completed push of newer data from target SystemB to group
multi.1.r96.
2009-06-29 14:44:05 PDT Switched Group multi.1.r96 was switched from secondary to primary.
2009-06-29 14:44:05 PDT Starting Starting group multi.1.r96 to target SystemB.
2009-06-29 14:44:09 PDT Started Remote copy was started for group multi.1.r96 and target
SystemB.
2009-06-29 14:44:09 PDT Completed Group multi.1.r96 failover completed.
Failing Over to the Asynchronous Periodic Backup System (with Data Transfer) 221
Vista de pagina 220
1 2 ... 216 217 218 219 220 221 222 223 224 225 226 ... 288 289

Comentarios a estos manuales

Sin comentarios