Hp 3PAR Operating System Software Manual de usuario Pagina 231

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 289
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 230
SystemA.
2009-06-29 14:56:56 PDT Syncing Synchronization started for group multi.1.r96 to target
SystemB.
2009-06-29 14:56:56 PDT Waiting Waiting for synchronization of group multi.1.r96 to target
SystemA to complete.
2009-06-29 14:56:56 PDT Waiting Waiting for synchronization of group multi.1.r96 to target
SystemB to complete.
2009-06-29 14:57:14 PDT Stopped Stopped remote copy of group multi.1.r96.
2009-06-29 14:57:15 PDT Switched Target SystemA of group multi.1.r96 was switched from
secondary to primary.
2009-06-29 14:57:16 PDT Switched Group multi.1.r96 was switched from primary to secondary.
2009-06-29 14:57:16 PDT Waiting Waiting for volumes in group multi.1.r96 to complete
snapshot promotions.
2009-06-29 14:57:17 PDT Starting Starting group multi.1.r96 to target SystemA.
2009-06-29 14:57:25 PDT Started Remote copy was started for group multi.1.r96 and target
SystemA.
2009-06-29 14:57:25 PDT Completed Group multi.1.r96 restore completed.
Failing Over to the Asynchronous Periodic Backup System (with Data Transfer) 231
Vista de pagina 230
1 2 ... 226 227 228 229 230 231 232 233 234 235 236 ... 288 289

Comentarios a estos manuales

Sin comentarios